Manufacturing

Engineering changes inweeks, not months

Automate your ECO/ECN process from request to implementation. AI-powered impact analysis, parallel approvals, and supplier notifications.

ISO 9001 Compliant
IATF 16949 Ready
AS9100 Compliant

ECO-2024-0142: Material Change

CCB Review

Change Request

Originator submits request with justification

Day 1

Impact Analysis

AI analyzes BOM, cost, inventory impact

Day 1

Technical Review

Engineering, Quality, Mfg review in parallel

Day 2-5
CCB

Change Control Board

Final approval and effectivity decision

Day 6
NOT

Notifications Sent

Suppliers, purchasing, production notified

Day 7
IMP

Implementation

Changes executed across all systems

Day 8-14

Impact Summary

BOM Impact

12 parts affected

Cost Impact

+$2.50/unit

Suppliers

Acme Corp

Documents

5 drawings

Why do engineering changes fail?

Poor change management costs manufacturers 5-10% of revenue in scrap, rework, and delays.

Weeks to Implement Changes

Average ECO takes 6-8 weeks from request to production. Emergency changes still take days.

Missed Notifications

Suppliers, quality, purchasing not informed of changes. Wrong parts ordered, shipped, or built.

Lost Impact Visibility

Nobody knows the full impact - cost, inventory, tooling, documentation. Changes create ripple effects.

Approval Bottlenecks

Changes stuck in email chains waiting for signatures. No visibility into who's holding things up.

Manage All Change Types

One platform for design, process, supplier, and document changes - with full traceability.

Design Change

Part geometry, material, or specification changes

Process Change

Manufacturing method, tooling, or routing changes

Supplier Change

New suppliers, alternate sources, or supplier process changes

Document Change

Drawing, specification, or work instruction updates

How It Works

End-to-End Change Automation

From change request through production implementation, every step is automated and tracked.

01

Intelligent Change Requests

AI-assisted ECR creation that automatically identifies affected parts, documents, processes, and stakeholders.

  • BOM impact analysis
  • Auto-populated affected items
  • Similar change suggestions
  • Risk classification
Feature Preview
02

Automated Impact Assessment

Instantly see cost impact, inventory exposure, tooling changes, and which suppliers and documents are affected.

  • Cost rollup calculations
  • Inventory write-off estimates
  • Supplier notification list
  • Document revision tracking
Feature Preview
03

Parallel Approval Workflows

Route changes to multiple reviewers simultaneously. Automatic escalation when approvals are late.

  • Role-based routing
  • Parallel/serial approval paths
  • Automatic escalation
  • Mobile approval
Feature Preview
04

Effectivity & Implementation

Manage effectivity by date, serial number, or lot. Track implementation across all production lines.

  • Date/serial/lot effectivity
  • Implementation checklists
  • Supplier confirmation tracking
  • Production floor updates
Feature Preview

The Cost of Poor Change Management

See how much you can save with automated change control.

70%
Faster change implementation
Before: 6 weeksAfter: 2 weeks
100%
Stakeholder notification
Before: 60%After: 100%
90%
Reduction in change errors
Before: 15%After: 1.5%
$250K
Saved per year in scrap
Before: Wrong parts builtAfter: Right first time
AI Copilot

AI-Powered Impact Analysis

Before you submit a change request, AI analyzes the full impact across your BOM, inventory, suppliers, and documentation.

BOM Explosion

"What assemblies and finished goods use this part?"

Cost Impact

"How much inventory will be affected? What's the tooling cost?"

Historical Learning

"Show me similar changes and what issues they had."

Engineer asks:

"I want to change the material on part #12345 from steel to aluminum. What's the impact?"

ECM Copilot

Impact Analysis for Part #12345:

BOM Impact:
- Used in 5 assemblies and 2 finished goods
- Affects customer programs: Ford F-150, GM Silverado

Cost Impact:
- Material cost: +$3.25/unit
- Current inventory: $42,500 (850 units)
- Tooling changes: None required

Documents to Update:
- 3 drawings, 2 specs, 1 control plan

Similar Changes:
- ECO-2023-089 (same part family) had a 3-week lead time from supplier.

Integrates with Your Systems

Push changes to PLM, ERP, MES, and supplier portals automatically.

PLM/PDM

Teamcenter
Windchill
Arena
SolidWorks PDM

ERP Systems

SAP
Oracle
Epicor
Microsoft Dynamics

MES

Plex
IQMS
Rockwell
Siemens Opcenter

Supplier Portal

Ariba
Coupa
Custom portals
Email integration

Ready to streamline engineering changes?

Join manufacturing leaders automating their ECO/ECN process with AI.

Free waitlist with early access
Priority access available (refundable)
Dedicated onboarding support
60-day money-back guarantee