Manufacturing

Equipment docs and PMalways audit-ready

Centralize equipment documentation, automate PM scheduling, and manage calibrations in one platform. Be audit-ready in minutes, not days.

Calibration Tracking
PM Scheduling
ISO/FDA Ready

CNC Vertical Mill #3

Asset: CNC-VM-003

Running

Next PM

Jan 28, 2026

Cal Due

Feb 15, 2026

Uptime

98.2%

Upcoming Maintenance & Calibrations

PM

Weekly Lubrication

Jan 28
Cal

Spindle Speed Calibration

Feb 15
PM

Monthly Filter Change

Feb 1

Coolant Pump Replacement

Completed

Why is equipment documentation so painful?

Critical equipment records scattered across filing cabinets, spreadsheets, and email.

Equipment Docs in Filing Cabinets

Manuals, PM schedules, calibration records scattered across filing cabinets, shared drives, and binders at each machine.

Audit Prep Takes Days

When auditors ask for equipment history, maintenance spends days compiling records from multiple sources.

Missed Calibrations & PMs

Spreadsheet-based tracking leads to missed calibrations and PMs. Equipment out of spec causes quality escapes.

No Equipment History

No single view of equipment lifecycle - repairs, modifications, parts replaced, issues encountered.

One Source of Truth for Equipment

Every document type, organized and linked to each piece of equipment.

Equipment Manuals

OEM manuals, operating procedures, safety guides

Maintenance SOPs

PM procedures, lubrication charts, inspection checklists

Calibration Certificates

Cal certs, standards traceability, uncertainty data

Validation Protocols

IQ/OQ/PQ protocols, validation reports, revalidation records

Spare Parts Lists

Recommended spares, vendor info, part numbers

Equipment Logs

Run logs, issue logs, modification history

How It Works

Complete Equipment Lifecycle Management

01

Digital Equipment Files

Complete equipment documentation in one place - manuals, drawings, specs, validation records, and maintenance history.

  • Equipment master records
  • Linked manuals & drawings
  • Modification history
  • Spare parts documentation
Feature Preview
02

Automated PM Scheduling

Schedule preventive maintenance by calendar, runtime hours, or production cycles. Automatic work order generation.

  • Calendar-based scheduling
  • Runtime hour triggers
  • Automatic work orders
  • Escalation alerts
Feature Preview
03

Calibration Management

Track calibration due dates, certificates, and out-of-tolerance events. Never miss a calibration again.

  • Due date dashboard
  • Certificate storage
  • OOT investigation tracking
  • External lab integration
Feature Preview
04

Equipment Copilot

AI assistant for maintenance technicians - instant access to manuals, troubleshooting, and equipment history.

  • Instant manual search
  • Troubleshooting guides
  • Parts lookup
  • Work order assistance
Feature Preview

From Reactive to Proactive Maintenance

See these results within 90 days of implementation.

99.5%
Calibration compliance
Before: 87%After: 99.5%
45%
Reduction in unplanned downtime
Before: 120 hrs/moAfter: 66 hrs/mo
90%
Faster audit response
Before: 3 daysAfter: 3 hours
$180K
Annual maintenance savings
Before: Reactive repairsAfter: Preventive focus
AI Copilot

Your maintenance technician's AI assistant

Instant access to manuals, troubleshooting guides, and equipment history - without digging through filing cabinets.

Instant Manual Search

"Show me the bearing replacement procedure for mill #3"

Parts Lookup

"What's the part number for the coolant pump on CNC-5?"

History Search

"When was the last time we replaced this motor?"

Maintenance Tech asks:

"The hydraulic press is making a whining noise. What should I check?"

Equipment Copilot

For Hydraulic Press #2 (HYD-PRESS-002), a whining noise typically indicates:

Most Likely Causes:
1. Low hydraulic fluid - Check reservoir level (should be 3/4 full)
2. Air in the system - Look for bubbles in reservoir
3. Worn pump - Last replaced 18 months ago (PM log shows 2,400 hours)

Maintenance History:
- Similar issue in June 2025 - resolved by bleeding air
- Pump manufacturer recommends replacement at 3,000 hours

Need me to pull up the hydraulic system diagram or pump replacement procedure?

Works with Your CMMS

Integrate with existing maintenance, calibration, and quality systems.

CMMS Systems

Maximo
SAP PM
Fiix
UpKeep

Calibration

Fluke
Keysight
Beamex
Cal Lab Mgmt

ERP

SAP
Oracle
Epicor
Microsoft Dynamics

Quality Systems

ETQ
MasterControl
Greenlight Guru
TrackWise

Ready for audit-ready equipment files?

Join manufacturing leaders automating their equipment and maintenance documentation.

Free waitlist with early access
Priority access available (refundable)
Dedicated onboarding support
60-day money-back guarantee