Manufacturing

Launch products40% faster

Automate your New Product Introduction process from concept to production. Manage APQP phases, PPAP documentation, and gate reviews in one platform.

APQP/PPAP Ready
AS9145 Compliant
FDA Design Controls

APQP Progress: Brake Assembly

Phase 3 Active

Phase 1: Plan & Define

Customer Requirements • Design Goals • Preliminary BOM

Phase 2: Product Design

DFMEA • Design Reviews • Prototype Build

3

Phase 3: Process Design

PFMEA • Control Plan • Floor Plan

In Progress
4

Phase 4: Validation

MSA • Ppk Studies • PPAP Package

5

Phase 5: Launch

Production Sign-off • Lessons Learned

PPAP Due DateMarch 15, 2026

55% complete • 12 of 18 PPAP elements ready

Why do product launches slip?

80% of NPI delays are caused by documentation issues, not engineering problems.

Launch Delays Cost Millions

Average NPI takes 18+ months. Each month of delay costs $500K-$2M in lost revenue and market share.

50+ Documents Per Product

Specifications, drawings, test reports, PPAP packages scattered across email, shared drives, and PLM systems.

Missed Gate Reviews

Critical documents not ready for design reviews. Teams scramble at the last minute, delaying decisions.

Cross-Functional Chaos

Engineering, Quality, Manufacturing, Purchasing all working in silos. No single source of truth for launch readiness.

PPAP Automation

All 18 PPAP Elements, Automated

Stop manually assembling PPAP packages. AI tracks, organizes, and compiles all required elements automatically.

Design Records
Engineering Change Docs
Customer Engineering Approval
Design FMEA
Process Flow Diagram
Process FMEA
Control Plan
MSA Studies
Dimensional Results
Material/Performance Tests
Initial Process Studies
Qualified Lab Documentation
Appearance Approval Report
Sample Products
Master Sample
Checking Aids
Customer-Specific Requirements
Part Submission Warrant
How It Works

End-to-End NPI Automation

From initial concept through PPAP approval, every phase is tracked, documented, and optimized.

01

Centralized NPI Document Hub

All product launch documentation in one place - specs, drawings, test reports, certifications, and customer requirements automatically organized.

  • Automatic document classification
  • Version control with full history
  • Linked to BOM and part numbers
  • Customer requirement traceability
Feature Preview
02

Automated Gate Review Workflows

Configure phase-gate processes (APQP, Stage-Gate, custom) with automatic task assignment, deadline tracking, and approval routing.

  • APQP Phase 1-5 templates
  • Customizable gate criteria
  • Automatic stakeholder notifications
  • Gate review document packages
Feature Preview
03

PPAP/FAI Document Automation

AI assembles Production Part Approval Process packages, First Article Inspections, and customer submission requirements automatically.

  • 18 PPAP element tracking
  • FAI report generation
  • Customer portal submissions
  • Approval status dashboard
Feature Preview
04

NPI Copilot Intelligence

Your AI assistant tracks launch readiness, identifies risks, answers questions about requirements, and generates status reports.

  • Launch readiness scoring
  • Risk identification alerts
  • Requirement Q&A bot
  • Executive status reports
Feature Preview

Measurable ROI from Day One

Our customers see these results within the first product launch.

40%
Faster time-to-market
Before: 18 monthsAfter: 11 months
95%
First-time PPAP approval
Before: 60%After: 95%
75%
Less document rework
Before: 40 hrs/launchAfter: 10 hrs/launch
$1.2M
Saved per launch
Before: Delays + reworkAfter: On-time delivery

Connects to Your Existing Tools

No rip-and-replace. We integrate with your PLM, ERP, CAD, and quality systems.

PLM Systems

Arena
Teamcenter
Windchill
Agile

ERP

SAP
Oracle
Epicor
IQMS

CAD

SolidWorks
AutoCAD
CATIA
Creo

Quality

Minitab
InfinityQS
ETQ
MasterControl
AI Copilot

Your NPI Program Manager, powered by AI

Get instant answers about requirements, track launch readiness, and identify risks before they become delays.

Requirement Traceability

"What customer requirements affect this drawing?" - Instant answer

Risk Alerts

Proactively identifies missing documents and approaching deadlines

Status Reports

Generate executive summaries and gate review packages automatically

Program Manager asks:

"What's blocking our PPAP submission for the brake assembly?"

NPI Copilot

Based on the PPAP checklist for part #BRK-2024-001:

3 elements are incomplete:
1. MSA Study - Awaiting gage R&R from Quality (due Jan 28)
2. Process Flow Diagram - Needs final approval from Mfg Eng
3. Control Plan - Missing SPC control limits for dimension 4.5

15 elements complete and approved.

Shall I notify the responsible owners and set up a checkpoint meeting?

Ready to launch products faster?

Join manufacturing leaders using AI to accelerate their NPI process.

Free waitlist with early access
Priority access available (refundable)
Dedicated onboarding support
60-day money-back guarantee